Overview

Whole-site shell, command surface and shared system layout.

Master Date Selection

Applies the selected date range across all modules.

All Time
Project director mission layer

Project Insights

A live executive control room that turns site demand, labour productivity, welfare rhythm, waste pressure, induction flow and visitor risk into decision-grade direction.

Mission Status
Main Threat
Immediate Intervention
System Confidence

Director Summary

Plain-English direction built from every available module and live request quality behaviour.

Live
Decision VelocityResponse tempo against live pressure.
Constraint IndexCombined demand, waste and labour drag.
Labour EfficiencyOperational capacity signal from live deployment.
Command LoadCritical actions and executive interventions in play.
Control Score
Composite discipline score across planning, execution and site readiness.
Weekly Operational Exposure
Estimated avoidable exposure from reactive demand, wasted time and delay pressure. Baseline planned labour already included in the daily operating model is excluded.
Waste Hours
Paid labour hours absorbed by unclear, late or inefficient requests. This tracks consumed capacity, not automatic extra spend.
High-Risk Requesters
Managers or supply chain leads currently creating disproportionate reactive burden, delay pressure or control risk.
Next 24h Risk
Predicted site pressure over the next day based on patterns and live constraints.
Next 3-Day Risk
Forward congestion risk from stacked demand, labour strain and waste exposure.

Executive Readout

Period facts only: consumed capacity, live exposure, separately logged extra spend, priority owner and the current recovery line.

Live facts
Capacity consumed
Operational exposure
True additional spend
Immediate recovery priority
Primary owner
Recovery line
Methodology, challenge notes and commercial definitions
Open this only when you need support material. Project Insights should stay focused on facts, owners, exposure and recovery. All support notes below should be read against the currently selected date range.

Commercial Logic & Definitions

Reference notes for interpreting labour value, exposure and separately logged extra spend in the selected period.

Methodology
Absorbed Labour ValuePaid labour capacity consumed by requests inside the normal operating model.
Operational ExposureEstimated avoidable burden created by reactive demand, wasted time and delay pressure.
True Additional SpendUse only where overtime, extra labour, plant standby, rebooking or another real cash cost occurred.
Waste HoursConsumed hours that reduced available logistics capacity. Useful for control, not a fake invoice line.
Delay & DisruptionOperational consequence of late planning, poor readiness, congestion or repeat urgent misuse.
Use ruleBaseline paid labour stays baseline unless the selected range shows real extra spend or clearly displaced planned duties.

Decision Thresholds & Recovery Standard

Control standard for when live exposure should be monitored, intervened, restricted, recovered or escalated.

Action standard
MonitorStable request quality, low wasted hours, low exposure, no repeated misuse. Keep visible and trend weekly.
InterveneRepeat reactive demand, rising wasted hours, poor readiness or growing exposure. Assign owner and corrective action.
RestrictUrgent misuse, repeated avoidable burden or unmanaged disruption. Force managed booking, escalation or approval gate.
RecoverWhere disruption is already live, show what gets pulled back, by who, by when and what commercial pressure is being contained.
EscalateUse when a requester, trade or area continues to consume capacity without improvement after intervention.
ProveEvery red item should show owner, action, time impact, absorbed labour value, exposure and any true additional spend.

Executive Proof Pack

Current-period facts and review lines generated from the selected range.

Challenge-proof
Proven in range
Live exposure
Logged extra spend
Action owner
Recovery line
Commercial position

Leadership Challenge-Proof Answers

Reference responses for commercial or leadership challenge when the selected range is reviewed.

Ready to use
Actual cost positionBaseline paid labour remains baseline cost unless the selected range contains separately logged extra spend.
Control impactRepeat reactive demand consumes capacity, increases delay pressure and can drive later recovery cost.
Required actionRestrict unmanaged urgent demand, correct readiness failures, assign owners and recover planned duties before disruption spreads.
“What can we defend?”
“What gets escalated?”
“What does success look like?”

Ownership & Recovery Ledger

Named owner, governance step and recovery window for the main live burden in the selected range.

Accountability
Primary owner
Primary pressure source
Immediate standard
Next governance step
Recovery window
Proof required

Command Action Engine

Prioritised actions tied to the data, the mission and the likely consequence of inaction.

Intervention

Cross-Module Mission Signals

The executive reading across labour, welfare, bins, inductions and visitor flow.

All modules

Requester Leaderboard

Ranked by control score, wasted hours, consumed capacity and operational exposure.

Ranked

High-Risk Panel

Repeat failure, urgent misuse, poor planning and readiness gaps.

High risk

Top Performer Panel

The strongest request discipline currently on the system.

Strongest discipline

Issue Heatmap

Time-based issue density by request submission hour.

24-hour pressure

Root Cause Analysis

Why the system is losing control, capacity or programme resilience.

Causal layer

Predictive Intelligence

Expected congestion, labour shortage, waste risk and trend deterioration.

Forward-looking

Resource & Exposure Layer

Separates absorbed labour value, operational exposure and delay pressure from true additional spend. Use true additional spend only where overtime, extra labour, rebooking or another real cash cost occurred.

Exposure
Avg Labour Value / Request
Top Resource DrainLargest consumer of paid labour capacity, not automatically extra cash cost.
Delay & Disruption Exposure
Urgent Abuse Rate
Restricted Requesters
Readiness Failures

Top Requesters by Operational Exposure

Where director attention will reduce reactive burden, delay pressure and poor planning behaviour. This is not a hard-cost league table.

Operational prioritisation
RequesterScoreClassRequestsWaste HoursOperational ExposureUrgent AbuseStatus

Requester Drilldown

Deep dive into a requester’s planning discipline, consumed capacity, operational exposure, true additional spend and enforcement state.

Interactive

Full Request Audit Table

Request-level audit with scoring, enforcement flags, absorbed labour value and operational exposure. Hard additional spend should only be logged where a real extra cost was incurred.

Full audit
TimestampRequesterContractorRoleAreaTaskPriorityLeadScoreClassWaste HoursOperational ExposureFlagsEnforcement
Tender resource command layer

Resources

Connects actual marshal delivery cycles with crane sessions and hoist delivery lifts. This module tracks when a vehicle enters the pit lane or gate, when it leaves, whether the delivery then continues through crane or hoist activity, what material moved, what level it went to, and which companies consume the most site resource time. Logistics Requests are excluded so this view stays focused on actual recorded resource usage.

Ready
Used after the vehicle leaves. Activity inside the live pitlane window is always matched first, then same-company crane/hoist activity can still attach if the recorder logs it late.
Awaiting resource loadLive Deliveries, Crane and Hoist published CSV feeds only. This module is factual and read-only.
Deliveries AnalysedSelected range
Matched Resource RateCrane and/or hoist matched to delivery
Avg Pitlane / Gate DwellVehicle in to vehicle out
Avg Delivery-To-EndVehicle in to final matched crane/hoist evidence
Total Resource HoursPitlane + crane + hoist tender allowance
Crane-Linked DeliveriesMatched crane sessions
Hoist Delivery LiftsUsage marked Delivery
Post-Vehicle ResourceResource continues after vehicle exits
Busiest Gate / PitlaneHighest delivery pressure
Slowest MaterialArrival to delivery end / hoist touch
Best Company ScoreStrict tender discipline grade
Company To ChallengeLowest score / highest pressure

Company Resource Scoreboard

Strict tender score per company. Scores are capped down if booking discipline, FORS evidence, open cycles, long chain time or post-vehicle resource continuation is poor, so high grades only go to clean, predictable resource users.

Company Delivery Cycle Matrix

For each company: vehicle in-to-out time, matched crane time, matched hoist delivery time/allowance, full delivery-to-end chain and the main gate/pitlane used. This is the tender evidence view for real resource demand.

Company Duration Performance

Average delivery-to-end duration by company. The bar includes pitlane dwell, matched crane sessions and matched hoist delivery activity/allowance.

Gate / Pitlane Resource Pressure

Which gate or pitlane is taking the most delivery pressure, average dwell and resource continuation. This answers “what gate?” directly.

Company Resource Burden Stack

Tender-weighted view of each company’s pitlane dwell, crane time and hoist delivery touch allowance.

Delivery Path Split

Shows whether deliveries are passing through pitlane only, crane only, hoist only, or both crane and hoist.

Resource Pressure By Hour

Actual arrivals, hoist delivery lift count and matched crane minutes by hour. Use this to protect busy windows and move bookings into cleaner slots.

Material Delivery-To-End Window

Material-level delivery duration from vehicle arrival through to matched hoist/crane completion. This highlights what materials consume the longest real site resource window.

Hoist Material Process Window

Delivery hoist usage by material. Uses actual hoist duration when finish timestamps exist, otherwise uses the hoist allowance and arrival-to-hoist touch evidence.

Hoist Usage, Materials & Passenger Lift Evidence

Full hoist usage split across delivery lifts, site movements and passenger/personnel lifts. Shows counts, actual finish-to-start time where available, tender allowance where finish evidence is missing, key materials, destination levels and companies using the hoist.

Total Hoist MovementsAll usage types in range
Passenger LiftsUsage or material marked passenger/personnel
Delivery Material LiftsMaterials moved for deliveries
Total Hoist TimeActual where finished, allowance where open

Hoist Time By Usage Type

Usage category, count, passenger lifts and time for each usage. Full-width evidence view showing total hoist time, average cycle time, finished evidence, key materials, levels and companies.

Hoist Material / Passenger Breakdown

Material type or passenger/personnel movement breakdown with count, total time, average time, levels and companies. Built for quick tender allowance decisions and vertical logistics planning.

Tender Planning Factor

Loads once data is available.

Company To Watch

Loads once data is available.

Material Constraint

Loads once data is available.

End-to-End Delivery Chain AuditOpen when detailed evidence is needed. Shows arrival, gate, vehicle out, pitlane dwell, matched crane, matched hoist, materials, levels and final delivery-to-end time.
ArrivalVehicle OutCompanyVehicleGate / PitlaneBookedFORSPitlane DwellCrane WindowHoist Delivery WindowMaterials / LevelsDelivery-To-EndMatch QualityStatus
Company Tender BenchmarkStrict score, grade and tender allowance table per company. Open this for contractor conversations and future prelim resource modelling.
CompanyScoreGradeDeliveriesGate / PitlaneMatched %Booked %FORS Evidence %Avg PitlaneAvg CraneAvg HoistAvg Delivery-To-EndTotal Resource HrsMain MaterialsTender Signal

Data Confidence & Matching Rules

Factual rule-set used by this module. It does not alter any source records.

Read-only
Delivery cycleMarshal In to matching Marshal Out for the same company / vehicle / gate / day.
Crane matchSame-company crane start-finish session overlapping the pitlane window, or starting within the selected post-exit matching window.
Hoist matchHoist row marked Usage = Delivery for the same company, during the pitlane window or within the selected post-exit matching window.
Late recorder protectionResource activity can still attach after the vehicle leaves because crane and hoist records may be submitted 30–60 minutes later by another person.
Vehicle released / delivery continuingFlagged where matched crane or hoist activity evidence continues after the vehicle leaves the pitlane or gate.
Company scoreStrictly capped by booking discipline, FORS evidence, open cycles, chain duration, resource continuation and total resource burden.
Hoist usage evidenceAll hoist usage types are counted, including delivery lifts, site movements and passenger/personnel lifts. Actual start-to-finish time is used where available; otherwise the tender allowance is shown clearly.
LSE1 Analytics · Director-grade operating truth

Analytics

One command lens for site performance: booked versus actual delivery discipline, late / early / no-show exceptions, crane control against the 10-hour working window, company behaviour, labour burden, welfare areas, waste records, inductions, visitors and the actions needed to improve the project.

Ready
Filter every chart and table by company / contractor / supplier.
Same-day matching stops false 0% results while still flagging late, early and no-show behaviour.
Controls out-of-schedule exception flags.
All Time
Crane Utilisation10h/site-day working window
Crane Control LeaderShare of actual crane minutes
Booked DeliveriesPlanned delivery records
Actual ArrivalsMarshal check-in records
Booked Vs Actual MatchBooked records found on site
Out Of ScheduleLate / early matched arrivals
No-ShowsBooked but not found in actuals
Unbooked ArrivalsActual arrivals without booking match
Avg Delivery DwellCheck-in to check-out evidence
Labour Task LoadTask hours and open starts
Welfare / WasteArea checks + bin / waste records
People FlowInductions + visitors

Director Operating Pulse

Visual board-level readout pulled from the Analytics KPIs: booking health, schedule discipline, crane utilisation and support / people-flow pressure.

Visual KPIs

Crane Utilisation, Time & Company Control

Every company’s actual crane minutes against the 10-hour day, plus their share of total crane control and what the crane was used for.

Booked Vs Actual Delivery Control

Colour-coded booked, arrived, no-show, unbooked and out-of-schedule pressure by company.

BookedActualLateEarlyNo-showUnbooked
Late Delivery ControlActual arrivals after the booked slot tolerance
Early Delivery ControlActual arrivals before the booked slot tolerance

Crane Timeline: Who Used It, When, Why

Actual crane sessions with start, finish, duration, usage type and control percentage.

10h day
DateTimeCompanyUsageDuration% of day% control

Booking Exception Intelligence

Exactly which bookings did not arrive, arrived late / early, or arrived without a booking.

Exceptions
StatusBooked SlotActual ArrivalCompanyVehicleDeltaGate / Material

Company Intelligence Lens

Whole-site view across all companies. Use the selector above to isolate one company.

Whole Site

Director Next Best Moves

Plain-English actions from live exceptions, capacity pressure, people flow and support-service evidence.

Action

Material / Resource Burden

What each delivery type consumes across dwell, crane, hoist and labour evidence.

Tender Evidence

Gate / Pit Lane Pressure

Which gate absorbs demand, where dwell time is highest, and where booking discipline needs intervention.

Peak Time Heatmap

Best and worst booking windows using actual arrivals, late arrivals, crane, hoist and labour pressure.

Labour Task Load

Task hours, task type, location pressure, open starts and the companies creating labour burden.

Task / AreaCompanyStartsCompletedOpenHoursAvgSignal

Welfare Checks & Areas

Separate welfare view by area, issue, frequency and most recent evidence.

AreaChecksIssues / NotesLatestSignal

Bin & Waste Records

Separate waste control by area, stream, fullness / action and recent pressure.

Area / BinRecordsWaste / StatusLatestSignal

Inductions

Separate onboarding flow by company, role and date pressure.

CompanyInductionsRoles / TradesLatestSignal

Visitors

Separate visitor flow by organisation, host / reason and front-of-house pressure.

OrganisationVisitorsHost / ReasonLatestSignal

Risk Relationships

Commercial director view of the relationships between poor booking discipline, crane control, labour drag, welfare / waste readiness and people-flow pressure.

Watch

Company Analytics Table

Click to open / close. Director-ready benchmark combining booked, actual, no-show, late, unbooked, crane control, dwell, labour, material, gate and support risk.

Click to close
CompanyBookedActualMatchedLate / EarlyNo-ShowUnbookedAvg DwellCrane HrsCrane ControlHoist HrsLabour HrsMain Material / TypeMain GateDirector Signal
McLaren LSE1 · Live APG Intelligence

Executive Site Intelligence Overview

Director-grade command lens across the full operating system: Resources, Live Deliveries, Booked Deliveries, Labour, Logistics Requests, Welfare, Bins, Inductions, digiVIS Visitors, Hoist, Crane, Integrity and Command Centre. Built to show what happened, what resource was consumed, what created pressure and what can be reused for future tenders and pre-con planning.

Live command state Loading APG Intelligence… Reading selected date range
Building whole-site intelligence from Live Deliveries, Hoist, Crane, Labour, Requests, Welfare, Bins, Inductions and Visitors…

Whole-Site Pressure Stack

One visual ranking of operational pressure across every live LSE1 module.

Operations

Resource Chain Pulse

Actual delivery flow joined with crane, hoist and labour demand to expose the true site-resource load.

Tender engine

Module Intelligence Wall

All active LSE1 / McLaren ONE modules included in the overview, including the newer Resources, Live Deliveries, Hoist and Crane layers.

16 modules

Pre-Con & Tender Evidence

Plain facts that can support prelims, future logistics plans, tender allowances and project replay assumptions.

Evidence pack

Director Decision Signals

Immediate actions and watchpoints driven by the selected overview range.

All time
McLaren LSE1 · Whole-Site Intelligence

LSE1 Command Overview

One director-grade view of what is actually happening: deliveries, booked slots, live pitlane demand, crane, hoist, labour, logistics requests, welfare, bins, inductions, visitors and resource pressure. Designed for live operations, prelims, pre-con and future tender evidence.

Loading site intelligence…
Building LSE1 command KPIs from live module data…

Operational Pressure Radar

Module-by-module pressure across deliveries, resources, labour, welfare, waste and compliance records.

Live pulse

Resource Chain Intelligence

Actual site-resource evidence: vehicle flow, hoist movements, crane allocation and labour support.

Tender signal

Module Pulse Board

Every active LSE1 module included in the overview, including the newer Resources, Live Deliveries, Hoist and Crane modules.

Modules

Pre-Con / Tender Evidence Snapshot

Simple facts a Project Director, Ops Director or pre-con team can reuse for future project planning.

Evidence

Today / Range Decision Signals

Key actions from the current selected date range. If no range is selected, the overview reads all available records.

All time
System Mode
Live APG Intelligence
Live APG Intelligence mode with persisted settings and active module data sources.
Modules Loaded
16
Project Insights, Resources, Overview, Live Deliveries, Booked Deliveries, Labour, Logistics Requests, Welfare, Bins, Induction, Visitors, Hoist, Crane, Integrity, Command Centre and Settings.
Live Refresh
OFF
Global refresh cycle now includes Logistics Requests when URL mode is active.
Urgent Request Pressure
High and critical logistics requests in the current requests dataset.

Command Board

Shared command surface now aggregates Logistics Requests signals and actions into the top-level overview.

Aggregated

Today at a Glance

High-level signals across the shell, with native requests pressure and demand concentration summaries.

OS Front Door

Top Actions Table

Extensible overview action architecture. Requests actions are already wired into this table.

Live
PriorityModuleIssueActionOwnerTargetStatus

Module Status

All current LSE1 modules are included in the OS overview, including Resources, Live Deliveries, Hoist and Crane.

16 modules
ModuleStatusPurposeLogic
Project InsightsLiveExecutive mission control, cross-module risk and predictive directionActive
OverviewLiveTop-level command and system summaryAggregated
ResourcesLiveDelivery-to-resource chain, material burden and tender benchmark engineActive
Live DeliveriesLiveActual marshal delivery arrivals, exits, gates, FORS and booking evidenceActive
LabourLiveOperatives, completion and backlog surfacePending
Booked DeliveriesLivePlanned booking and slot-control surfaceActive
Logistics RequestsLiveRequest demand, requester and area intelligenceActive
WelfareLiveService, stock and support shellPending
BinsLiveWaste and overflow monitoring shellPending
InductionLiveInduction throughput and attendance shellPending
VisitorsLiveVisitor bookings and site reception shellPending
HoistLiveVertical logistics by company, material, usage type and levelActive
CraneLiveCrane allocation, company share, lifting pressure and resource allowanceActive
Integrity & ProductivityLiveFair output confidence, verification and intervention commandActive
Command CentreLiveRapid executive site decisions, priorities and actionsActive
SettingsLivePersistence, sources, thresholds and sync preferencesWorking

Labour Command

Native APG OS labour intelligence using the task-force completion rule: same operative, same level, START and FINISH within 60 minutes.

No Data
Labour uses uploaded CSV or published CSV URL only. No embedded data is used.
No labour data loaded yet. Upload a CSV or configure a published CSV URL.
Tasks Started
All START events in the filtered labour dataset.
Tasks Completed
Matched START/FINISH pairs within the 60-minute rule.
Completion Rate
Completed tasks divided by started tasks.
Open Starts
Started tasks without a matched finish inside the rule window.
Top Operative
Highest completed-task operative in the current view.
Performance Rank
Completion health derived from the overall completion rate.
Avg Completion Time
Average minutes from START to FINISH for matched tasks.
Most Active Level
Level with the highest completed-task count.
Highest Incomplete Operative
Operative carrying the largest unmatched-start backlog.
Low Performing Level
Weakest completion health level in the filtered view.
Open Pressure
Supervisor signal from current open-start concentration.
Data Range
Current filtered period across the labour module.

Labour Completion Period Facts

Fixed calendar completion rates from all loaded Labour records. These facts ignore the master date filter.

Fixed Facts
RankPeriodStartedCompletedCompletion RateOpen StartsTop OperativeSignal

Operative Performance Intelligence

Individual labourer performance for the active master date range, with fixed-period comparison for today, week, month and all time.

Per Operative

Completion Rate by Operative

Selected-range completion health for every operative on file in this period.

Active-Time Rhythm

Peak activity hour, quietest hour, average task time and gap between tasks.

#OperativeStartedCompletedCompletion RateOpenAvg TaskAvg GapActive WindowPeak / QuietTop AreasSignal
OperativeTodayThis WeekThis MonthAll TimeBest PeriodCommand Note

Performance / Command

Overall completion health, command thresholds and concise supervisor summary.

Completion Health

Threshold view for completion rate, open starts, average completion time and low-performing levels.

MeasureCurrentThresholdStatus

Average Completion Time by Operative

Average matched completion minutes for each operative.

Top Operatives: Today / Week / Month

Most productive operatives across rolling command windows.

PeriodWindowOperativeCompletedOpen Starts

Operative Rankings — All Time

Completed tasks, open starts, completion rate and average completion time by operative.

Level Intelligence

Completion performance and backlog distribution by level or zone.

Operative × Level Matrix — Today

Completed tasks by operative and level today.

Operative × Level Matrix — This Month

Completed tasks by operative and level this month.

Operative × Level Matrix — All Time

Completed tasks by operative and level across all loaded labour records.

Level Trend Focus

Comparative level output across today, week and month windows.

Focus Intelligence

Levels needing extra supervision due to weak completion health or low finish volume.

Hourly Activity Patterns

Finished-task cadence by hour across the filtered range.

Operative Rankings

Native OS ranking table for operative output and backlog risk.

#OperativeCompletedOpen StartsCompletion RateAvg CompletionTop Level

Level Intelligence Table

Level-level view of completion, incomplete pressure and average completion time.

LevelStartedCompletedCompletion RateOpen StartsAvg CompletionStatus

Incomplete Watchlist

Operatives with the largest unmatched-start burden.

OperativeOpen StartsCompletedCompletion RatePrimary LevelOwner

Unfinished Task Alerts

Latest unmatched START records still open under the 60-minute completion rule.

OperativeLevelStartedAgeStatus

Labour Action Table

Supervisor actions generated from completion, backlog, level focus and open-start pressure.

PriorityModuleIssueActionReasonOwnerTargetStatus

Integrity Watchlist · Labour

High burst density watchlist for Labour, using the selected Integrity date scope.

High burst density
Delivery State
Shell
Bookings and slot logic not yet connected.
Gate Controls
UI
Foundation present for future live delivery intelligence.
Refresh Path
Live
Designed for published CSV URL inputs later.
Actions
Later
Reschedule and congestion logic comes in next phase.

Deliveries Module

Gate bookings, slot pressure, congestion, commercial model and actions will live here.

Module page
Delivery logic deliberately excluded from this step.Staged
The UI shell is ready for bookings tables, lane heatmaps, slot-value assumptions and action recommendations.

Bookings / Congestion Space

Future charts and delivery tables slot into this structure.

Logistics Requests Command

Native APG OS implementation of request flow intelligence, labour pressure, priority mix, requester concentration and required-date outlook.

Embedded Data
Uploading here overrides URL mode for testing until the next explicit URL refresh.
Requests module loaded from embedded seed data.
Total Requests
All requests in current filtered view.
Ops Requested
Total labour demand requested.
High / Critical Priority
Urgent requests in active view.
Unique Requesters
Distinct request owners represented.
Active Areas
Locations represented in filtered view.
Avg Ops / Request
Average crew size being requested.
Top Requester
Largest request source in the current view.
Top Area
Location with the strongest demand concentration.
Peak Day
Day with the highest request count.
Likely Demand Day
Strongest weekday pattern.
Top Request Type
Most common request category.
Most Recent Request
Latest request in the filtered dataset.
Demand Command
Overall logistics request demand, urgency, concentration and timing.

Demand Command

Overall logistics request demand, urgency, concentration and timing.

Requester Intelligence
Who is asking for the most work, labour required and urgency generated.

Requester Intelligence

Who is asking for the most work, labour required and urgency generated.

RequesterRequestsOpsHigh/CriticalShare
Area & Location Intelligence
Demand concentration by area, including ops loading and dominant request type.

Area & Location Intelligence

Demand concentration by area, including ops loading and dominant request type.

AreaRequestsOpsHigh/CriticalTop Type
Priority Mix
Distribution of urgency across the requests dataset.

Priority Mix

Distribution of urgency across the requests dataset.

Request Type Mix
What support type the site is requesting most often.

Request Type Mix

What support type the site is requesting most often.

Role Breakdown
Which site roles are generating the strongest logistics demand.

Role Breakdown

Which site roles are generating the strongest logistics demand.

Daily Demand Trend
How request volume changes day by day.

Daily Demand Trend

How request volume changes day by day.

Weekday Pattern
Which weekday is historically strongest in the active window.

Weekday Pattern

Which weekday is historically strongest in the active window.

Required Date Outlook
Demand landing against explicitly requested future dates.

Required Date Outlook

Demand landing against explicitly requested future dates.

Task Demand Table
Request-level visibility including requester, area, priority, task and estimated hours.

Task Demand Table

Detailed request-level visibility including requester, role, area, type, priority, ops and timing.

TimestampRequesterRoleAreaTypePriorityOpsRequired DateTaskEst Hours
Recommendations & Risks
Risk-driven recommendation layer from demand pressure, concentration and outlook.

Recommendations & Risks

Risk-driven recommendation layer generated from demand pressure, concentration and outlook.

RecommendationReasonStatus
Requester × Priority Matrix
Requesters generating the strongest urgent logistics demand.

Requester × Priority Matrix

Which requesters are generating the strongest share of urgent logistics demand.

Requests Action Table
Dedicated OS-style action table for Logistics Requests.

Requests Action Table

Dedicated OS-style action table for Logistics Requests.

PriorityModuleIssueActionReasonOwnerTargetStatus
Welfare State
Shell
Service and consumable logic deferred.
Source Type
CSV
Designed for later upload and URL-driven data flow.
Primary Focus
Stock
Coverage, cleaning and service scheduling later.
Action Layer
Next
Refill and service action engine comes after shell phase.

Welfare Module

Prepared for future coverage KPIs, issue tables, service states and low-stock actions.

Module page

Integrity Watchlist · Welfare

High burst density watchlist for Welfare, using the selected Integrity date scope.

High burst density
Bins State
Shell
Waste calculations intentionally not added yet.
Future Inputs
Levels
Capacity, collections and overflow triggers later.
Primary View
Risk
This module will evolve into operational waste visibility.
Collections
UI
Staged visual shell for future collection workflows.

Bins Module

Reserved for fill-level monitoring, contractor collections and overflow risk actions.

Module page
Induction State
Shell
Hidden module page is in place and routable.
Future Focus
Flow
Attendance, throughput, failed checks and scheduling later.
Source Plan
CSV
Will accept local CSVs or published URLs when logic lands.
Status
Ready
Shell built, logic deferred.

Induction Module

Prepared for onboarding visibility, induction completion and daily intake monitoring.

Hidden page
Visitors State
Shell
Page present with future visitor control focus.
Primary Focus
Front Desk
Bookings, arrivals, dwell time and host visibility later.
Source Path
CSV
Prepared for staged offline or published-sheet operation.
Status
Ready
UI shell is ready for next build layer.

Visitors Module

Reserved for visitor bookings, reception flow and daily front-of-house status.

Hidden page
OPERATIONAL INTEGRITY & PRODUCTIVITY COMMAND Explainable, predictive and accountable command intelligence focused on fair productivity review, welfare rhythm assurance, confidence-based verification and decisive intervention planning.
Live — updates continuously based on today’s activity

Integrity Scope

Switch between live-today command mode and a custom historical range without changing the accountability logic.

Live Today Mode
Current ScopeLive Today Mode · Today
Today

COMMAND DECISION (NOW)

Immediate authority layer for live intervention, ownership, timing and review discipline.

Awaiting live command
Intervention Status
Time Expectation
Next Review
Operatives Monitored
Distinct labour and welfare operatives seen in today’s activity.
Welfare Operatives Monitored
Active welfare coverage footprint for today only.
Productivity Alerts
Support-needed and underperforming patterns requiring intervention.
Integrity Alerts
Review-required and verification-required activity patterns.
Avg Task Time
Average duration from real activity windows, not raw counts alone.
High-Risk Activity Bursts
Repeated unrealistic burst windows needing verification.
Live Confidence Score
Confidence based on repeated patterns, not single events.
Command Status
Real-time command reading for intervention urgency today.

Today’s Command View

Executive command summary of who is strongest, where support is required, where welfare rhythm is behind, and where verification must happen before escalation.

Today only

Top Priorities (Next 60–90 Minutes)

Awaiting live command refresh.

Live Confidence Meter

Confidence drops only when repeated unrealistic patterns stack up and remain unmatched by normal rhythm.

High confidence
Highest performer available
Weakest support area
Verification ownerSupervisor

System Confidence

Leadership-facing view of coverage, reliability and cross-signal strength.

High
System Confidence
Data Coverage
Cross-signal Validation

Operative Accountability Surface

Premium command view of labour and welfare accountability, level-weighted performance, inactivity review and targeted recommendation quality.

Unified accountability

Productivity Scoreboard

Fair, time-based assessment of actual output vs expected output for the active integrity scope, with explainable confidence, inactivity review and intervention context.

Live today
RankNameRoleArea / LevelTasks StartedTasks CompletedAvg DurationActive SpanIdle TimeInactivity RiskExpected OutputActual OutputProductivity StatusConfidence ScoreConfidence BreakdownIntervention HistoryOutcome TrackingRecommended Action

Integrity Watchlist

Pattern-led review list only. Single short tasks do not trigger review. Every item explains why it triggered and what should be verified next.

Review required
OperativeAreaPattern DetectedTime WindowBurst CountAvg DurationConfidence LevelWhy this triggeredConfidence breakdownAction confidenceRecommended verification

Activity Timeline / Rhythm

Productive periods, idle gaps, burst windows and welfare rhythm across the active integrity scope.

Heat strip

Live Alert Cards

Clear intervention guidance with ownership, explainability, projected consequence and review discipline.

Actionable

Action Engine Table

Specific operational actions only. If uncertain, verify physically before escalation. Every action includes expected outcome, risk if ignored and post-action outcome tracking.

Operational next steps
PriorityModuleIssueActionReasonOwnerTargetReview TimeAction ConfidenceExpected OutcomeRisk if IgnoredOutcome (post-action)Status

SYSTEM LEARNING & ADAPTATION

Structured operational learning from similar patterns, successful interventions, confidence movement and earlier detection timing.

Adaptive

WASTE IMPACT ANALYSIS

Waste pressure is treated as an operational constraint signal. The engine checks whether congestion, stale bins or rising full-bin ratios are suppressing labour output before assigning labour-only accountability.

Waste aware
Waste intelligence will appear here when bins data is available.

Area / Level Hotspots

Operational command layer identifying strongest output, weakest output, welfare lag, integrity-risk and highest-impact redeployment.

Hotspots

Fairness Panel

How the command logic stays explainable, proportionate, defensible and trusted.

Fair by design

Recorded-duration logic

This engine uses recorded durations, active span and realistic activity rhythm — not raw task counts alone — before classifying support need.

Short tasks alone do not trigger concern

One short task or one fast sequence does not reduce confidence. Only repeated unrealistic patterns across stacked windows create review pressure.

Support is not verification

Support-needed and verification-needed are treated separately so the system remains fair, credible and operationally useful.

Physical verification before escalation

Where confidence is low, supervisor, logistics, welfare or site manager verification is required before concern is escalated. The engine prefers verification over assumption.

COMMAND HERO / SITE STATUS

Immediate executive view across labour, welfare, bins, deliveries and requests.

Live

SITE STATUS — AWAITING DATA

Upload live operational data to activate rapid site decisions and priority actions.

Current Main Issue
Main Level of Concern
Top Immediate Action
Last Data ScopeLive today

SITE HEALTH

Fast read of stability, pressure and command confidence.

Command live

SITE COMMAND — NEXT ACTIONS

Only the highest-value actions across the site right now.

Prioritised

LABOUR SNAPSHOT

Best and weakest performance, pairing, inactivity and level deployment signals.

Labour

WELFARE SNAPSHOT

Coverage, underperformance, stock and immediate support needs.

Welfare

BINS SNAPSHOT

Waste pressure, full bins, critical levels and clearance need.

Bins

DELIVERIES SNAPSHOT

Gate flow, backlog, deliveries, collections and next logistics action.

Deliveries

REQUESTS SNAPSHOT

Urgent requests, demand clustering and deployment actions.

Requests

EXECUTIVE TAKEAWAY

The single view for what matters most right now.

Fast read

RAPID ACTION NOTES

What cannot wait, what can wait, and where supervisor review is required.

Executive notes
Marshal Recorded Delivery Command

Live Deliveries Intelligence

Actual delivery arrivals and exits recorded by marshals, with booking discipline, FORS evidence, pitlane pressure, crane interface and company behaviour converted into tender-grade facts.

SourcePublished CSV locked
Rows Loaded0
Last RefreshNever
Active RangeAll time

Director Facts

High-impact facts only, calculated from the selected range.

Live

Booked vs Unbooked Delivery Split

Percentage of actual arrivals recorded as booked, unbooked or unverified.

Booking discipline

Company Booking Discipline

Which companies book properly, arrive unbooked, or leave booking status blank.

Company split

Pitlane / Gate Utilisation

Which delivery gate or pitlane is carrying the live delivery load.

Gate pressure

Peak Time Heatmap

Hour-by-hour delivery pressure for marshal resourcing and pitlane control.

24h pattern

Daily Actual Delivery Demand

Daily arrivals, booked/unbooked split, crane-required arrivals, FORS evidence and hoist movement demand.

Daily trendClose

Company Share of Site Deliveries

Percentage of actual delivery arrivals by company in the selected range.

Usage %

Crane Interface + FORS Evidence

Crane-required arrivals overlaid with FORS evidence coverage.

Compliance

Unbooked Pressure

Top companies creating unplanned live delivery demand.

Unbooked

FORS Evidence Gap

Companies with missing or non-compliant FORS evidence in actual arrivals.

FORS

Turnaround Control

Dwell duration, open arrivals and unmatched exits.

Dwell

Company Delivery Benchmark

Company-level share, booking discipline, FORS evidence, crane reliance, peak time and dwell facts.

Companies
CompanyArrivalsShareBookedUnbookedUnknownFORS EvidenceCrane RequiredAvg DwellTop PitlanePeak Hour

Pitlane / Gate Benchmark

Gate-by-gate volume, booking quality, crane dependency and FORS evidence rate.

Gates
Pitlane / GateArrivalsShareBookedUnbookedCrane RequiredFORS EvidencePeak HourBusiest Company

Data Sources

CSV upload controls and published CSV URL fields are present for each module.

Persistent
Global shell mode used for status labels and coordination.
No CSV files selected yet.

Logistics Requests Settings

Requests source mode, published CSV URL, live load status and editable thresholds.

Embedded
Embedded seed data loaded.
Never

Live Refresh

Global refresh settings. The Logistics Requests module participates when its source mode is set to published CSV URL.

Active
Enable Live RefreshRequests URL sources will refresh silently in the background, preserve last good data on failure and update the overview without disrupting the active page.

Export UI

Export the complete current OS view to a colour PDF and clear stored data when needed.

Live
Export generates a colour PDF of the current visible OS window. Clear All Stored Data removes saved settings and loaded datasets.

Saved Settings Structure

Current localStorage-backed settings object for the OS shell and Logistics Requests module.

localStorage
KeyPurpose
dataModeLocal CSV, published CSV or hybrid shell mode.
moduleUrlsPublished CSV URL fields per legacy module.
liveRefreshEnabled flag, interval and strategy for refresh cycle.
requests.sourceModeEmbedded, uploaded CSV or published CSV URL mode.
requests.csvUrlRequests module published CSV URL.
requests.thresholdsPriority, concentration, spike and ops-per-request trigger levels.
requests.lastSuccessfulRefreshLast successful requests refresh timestamp.
uploadsClient-side remembered filenames for shell uploads.
exportFormat and branding preferences.
notesImplementation notes and data mapping comments.
lastPageMost recent active page for navigation persistence.
💬